The hardware and bandwidth for this mirror is donated by METANET, the Webhosting and Full Service-Cloud Provider.
If you wish to report a bug, or if you are interested in having us mirror your free-software or open-source project, please feel free to contact us at mirror[@]metanet.ch.
This vignette focuses on posterior predictive inference using extreme value models. Posterior predictive inference is the prediction of unobserved variables conditional on observed data, performed by integrating parameter-specific inferences over a posterior distribution for model parameters. In practice, the integration averaging is performed using an empirical average based on samples from the posterior distribution. The vignette Introducing revdbayes covers the sampling from extreme value posterior distributions and the vignette Faster simulation using revdbayes considers how to do this more quickly.
We consider two uses of posterior predictive inference. In the first we simulate from the posterior predictive distribution many replicates of the observed data. A comparison of these replicates to the observed data provides a way to assess the fit of the model: systematic differences in behaviour between the observed and replicated data suggest features of the data that are not represented well by the model. For greater detail see Chapter 6 of Gelman et al. (2014). Secondly, we define as the variable of interest the largest value \(M_N\) to be observed over a future time period of length \(N\) years and estimate under the extreme value model the conditional distribution of \(M_N\) given the observed data. This accounts for uncertainty in model parameters and for uncertainty owing to the variability of future observations.
We illustrate the code used to perform these two tasks using the
portpirie
and gom
datasets that feature in the
vignette Introducing
revdbayes.
We produce posterior samples for later use. The argument
nrep = 50
to rpost
results in 50 simulated
replicates of the data being returned in
object$data_rep
.
### GEV model for Port Pirie Annual Maximum Sea Levels
data(portpirie)
mat <- diag(c(10000, 10000, 100))
pn <- set_prior(prior = "norm", model = "gev", mean = c(0,0,0), cov = mat)
gevp <- rpost(n = n, model = "gev", prior = pn, data = portpirie, nrep = 50)
### GP model for Gulf-of-Mexico significant wave heights
u <- quantile(gom, probs = 0.65)
fp <- set_prior(prior = "flat", model = "gp", min_xi = -1)
gpg <- rpost(n = 1000, model = "gp", prior = fp, thresh = u, data = gom, nrep = 50)
The pp_check
method pp_check.evpost
provides an interface to the posterior predictive checking graphics
available in the bayesplot package (Gabry and Mahr 2017). For details see the
bayesplot vignette Graphical posterior
predictive checks. bayesplot functions return a
ggplot
object that can be customised using the
ggplot2 package (Wickham
2009).
library(bayesplot)
#> This is bayesplot version 1.11.1
#> - Online documentation and vignettes at mc-stan.org/bayesplot
#> - bayesplot theme set to bayesplot::theme_default()
#> * Does _not_ affect other ggplot2 plots
#> * See ?bayesplot_theme_set for details on theme setting
library(ggplot2)
We show three examples of the graphical posterior predictive checks that are available from bayesplot.
Calling pp_check
with type = "overlaid"
produces plots in which either the empirical distribution functions or
kernel density estimates of the observed and replicated data are
compared. If the model fits well then the observed data should look like
a typical replication from the posterior predictive distribution, which
seems to be the case here.
Using type = multiple
produces multiple plots, rather
than overlaid plots, with subtype
indicating the type of
plots to be drawn. By default only 8 plots of replicated data are drawn,
but this can be changed using the nrep
argument. Again, the
plot of the observed data is not obviously different from those of the
replicated data.
The default setting for pp_check
is to produce a plot
that compares the values of test statistics for the observed and
replicated data. The argument stat
defines the test
statistic (or a pair of test statistics) to use, using either the name
of a standard function or a user-defined function. For a model that fits
well the value of the statistic calculated from the observed data should
not be unusual compared to the values calculated from the replicated
data. In this example, the plots do not suggest clear lack-of-fit.
pp_check(gpg)
#> `stat_bin()` using `bins = 30`. Pick better value with `binwidth`.
pp_check(gpg, stat = "max")
#> `stat_bin()` using `bins = 30`. Pick better value with `binwidth`.
pp_check(gpg, stat = c("min", "max"))
iqr <- function(y) diff(quantile(y, c(0.25, 0.75)))
pp_check(gpg, stat = "iqr")
#> `stat_bin()` using `bins = 30`. Pick better value with `binwidth`.
Posterior predictive inferences for the largest value \(M_N\) to be observed over a future time
period of length \(N\) years is
performed by the predict
method for the objects of class
evpost
returned from rpost
. Objects returned
from predict.evpost
have class evpred
. The
plot
method for these objects produces graphical summaries
of the output from predict
.
To perform predictive inference about \(M_N\) we need to provide, or assume,
information about the timescale covered by the data. To do this we need
to supply the mean number npy
of non-missing observations
per year, either in the call to rpost
or the call to
predict
. For the GEV and OS models it is often the case
that the input data are annual maxima, so npy = 1
is the
default value if npy
is not supplied. For the PP model a
similar assumption is made: see the documentation for
predict.evpost
for details. For the binomial-GP model (note
that we need the binomial part in order to account for the rate at which
the threshold is exceedance) npy
must be provided by the
user.
Let \(F_{M_N}(z; \theta)\) denote the distribution function of \(M_N\) conditional on the parameters \(\theta\) of an extreme value model and let \(\pi(\theta \mid x)\) be the posterior distribution of \(\theta\) given the observed data. Then, if we assume that given \(\theta\) future observations are independent of the data \(x\) then posterior predictive distribution function of \(M_N\) given only the data \(x\) is given by \[ P(M_N \leqslant z \mid x) = \int F_{M_N}(z; \theta) \, \pi(\theta \mid x) {\rm ~d}\theta. \] We estimate \(P(M_N \leqslant z)\) using \[ \hat{P}(M_N \leqslant z \mid x) = \frac1m \sum_{j=1}^m F_{M_N}(z; \theta_j), \] where \(\theta_j, j=1, \ldots, m\) is a sample from the posterior distribution \(\pi(\theta \mid x)\).
The form of \(F_{M_N}(z; \theta)\)
depends on the extreme value model. The GEV, OS and PP models are each
parameterised by the location, scale and shape parameters of a GEV
distribution. Let \(G(z; \theta)\) be
the GEV distribution function for an annual maximum under a given such
model, after appropriate adjustment for the value of npy
.
Then, \(F_{M_N}(z; \theta) = G(z;
\theta)^{N}\). For the binomial-GP model, provided that \(z\) is the greater than the threshold \(u\), \(F_{M_N}(z;
\theta) = F(z; \theta)^{n_{py} N}\), where \(n_{py}\) is the value of npy
and \[ F(z; \theta) = 1-p_u
\left\{1+\xi\left(\frac{z-u}{\sigma_u}\right)\right\}^{-1/\xi}.
\] See Northrop, Attalides, and Jonathan
(2017) for greater detail.
We repeat the posterior simulation for the Gulf-of-Mexico example,
changing model = gp
to model = bingp
in the
call to rpost
to add inferences about the probability of
threshold exceedance based on a binomial distribution.
### Binomial-GP model for Gulf-of-Mexico significant wave heights
u <- quantile(gom, probs = 0.65)
fp <- set_prior(prior = "flat", model = "gp", min_xi = -1)
bp <- set_bin_prior(prior = "jeffreys")
# We need to provide the mean number of observations per year (the data cover a period of 105 years)
npy_gom <- length(gom)/105
bgpg <- rpost(n = 1000, model = "bingp", prior = fp, thresh = u, data = gom,
bin_prior = bp, npy = npy_gom, nrep = 50)
We plot, for the analyses of the portpirie
(GEV) and
gom
(binomial-GP) datasets, the estimated posterior
predictive density functions and distributions functions of \(M_N\) for \(N =
100\) and \(N = 1000\). The
argument n_years
gives the value(s) of \(N\).
# GEV (Portpirie)
plot(predict(gevp, type = "d", n_years = c(100, 1000)), cex = 0.7)
plot(predict(gevp, type = "p", n_years = c(100, 1000)), cex = 0.7)
# binGP (Gulf-of-Mexico)
plot(predict(bgpg, type = "d", n_years = c(100, 1000)), cex = 0.7)
plot(predict(bgpg, type = "p", n_years = c(100, 1000)), cex = 0.7)
As one would expect there is greater uncertainty for \(N=1000\) than for \(N=100\). In making inferences over a period of length 1000 years a large degree of uncertainty is to be expected. For the Gulf-of-Mexico data in particular, this results in appreciable probability on values of significant wave height thought by experts to be physically unrealistic.
The default setting for predict.evpost
is to estimate
posterior predictive intervals for \(M_N\). In addition to n_years
we can specify the probability level level
of the
interval(s), that is, the estimated probability that \(M_N\) lies within the interval. Two types
of interval can be calculated. One is an equi-tailed interval in which
the estimated probability that \(M_N\)
lies below the lower limit of the interval is equal to the estimated
probability that \(M_N\) lies above the
upper limit of the interval. Typically, there will exist intervals of
the required probability level that is shorter than the equi-tailed
interval. predict.evpost
can search for the shortest such
interval. If the estimated posterior predictive distribution is unimodal
then this interval is the highest predictive density (HPD)
interval, with the property that at all values inside the interval the
estimated posterior predictive density is greater than at all values
outside the interval. If hpd = FALSE
then only equi-tailed
intervals are returned. If hpd = TRUE
then both types of
interval are returned.
The plot.evpred
method plots the estimated posterior
predictive intervals for each value in n_years
and each
level in level
. The argument which_int
controls which of the two types of interval are included. The dashed
lines give the HPD intervals and the solid lines the equi-tailed
intervals. Each line is labelled by the level of the interval.
These binaries (installable software) and packages are in development.
They may not be fully stable and should be used with caution. We make no claims about them.